We moved oversize bridge beams from Quebec, QC. to the Phelpston, ON. for the Vigo Project.
Here is the equipment we used for the 7 loads:
- 1 x 3 axel flatbed load – 58000 lbs
- 4 x 53’ expendable flatbed loads measuring 104’ long – 58000 each load
- 2 x 53’ extendable flatbed load measuring 86’ long – 51000 each load
#whatittakes